Services



Considering new infrastructure? Have you considered technology first?

Assessment reports (Junctions / Networks)  

Assets review 

 Traffic signal renewals studies  

Public Transport  Priority studies  

Bid support / technical advice  

Isolated modelling (LinSig)  

Micro-simulation Modelling (Vissim / PCMOVA)  

Network Management Strategy (bespoke product) 

 UTMC Architecture  

Collaborative traffic Management Solutions  

Communication support  

Client Relations 

Traffic Signal Design (Concept, Preliminary and Detail)  

Detection design (Induction, Wireless, Above ground, Video)  

TA84 Design file  

Traffic Signal Schematics / Schedules  

Bus / HGV Priority Design  

MOVA Design  

SCOOT Design  

UTMC Design  

UTC Design  

Communication design  

CCTV design  

TOPAS 2500’s  

Temporary signal design (Construction support) 

S278 traffic signal / modelling aspects

  Isolated Models (LinSig)  

Micro-simulation model (Vissim / PCMOVA)

  Traffic signal designs  

TA84 design file  

MOVA designs  

MOVA datasets  

SCOOT designs  

Road Markings  

Temporary Traffic signal designs  

TOPAS 2500’s  

Network Management Strategy 

Site assessment  

Asset review / management  

Factory acceptance testing  

Site acceptance testing  

MOVA validation  

SCOOT Validation  

CLF Plans 

 UTC Plans  

VA timings  Strategy 

Implementation  

Contractor traffic signal support  

Remote support (If available)  

Fault management  

Firmware updates  

Site documentation process 

 IC4 traffic signal configurations 

LinSig  

Traffic Signal Design  

TOPAS 2500’s  

Special conditioning  

MOVA Basic  

MOVA advanced  

SCOOT  

PCMOVA  

UTC  

UTMC  

Stratos  

Siemens UX  

Siemens Inview 

Client – “Your expertise of MOVA and the ability to mobilise quickly were a valuable asset to us in ensuring minimal disruption to the network” 

Client – “Due to your recent MOVA validation work and the increased performance using the existing technology you have saved us potential 2 million pounds on an improvement scheme. We are delighted with the results.” 

Often new infrastructure is considered the only option going forward however, using technology can be a viable cost-effective solution.